Tuesday, April 27, 2010

Day 2



After entering Environmental Studies Will Miller announced that we would be calling Craig Robertson, an independent building contractor, hearing that he had experience with solar panels. After dialing him I had to pass off the journal to Rubia because I was seemingly incapable of keeping up with the "fast paced" conversation that ensued. To our surprise Craig Robertson did NOT actually work with solar panels, but in fact worked with solar water heating. After clearing up this small miscommunication Craig was kind enough to point us in the right direction telling us to call Chris Kilfoyle who actually worked with solar electricity and the like at, Berkshire Photovoltaic Services. He told us about a cheaper version of solar panels which are thin films of photovoltaic which can be attached to our roof; along with loopholes about building structures on campus negating the need for a building permit. Our shed is now classified as a "temporary structure" which may very well be true if it Somehow doesn't hold together. We thanked him for his time then headed outside to do some awesome physical labor.

The felled log from day prior was hoisted by every available member (except for the photographer) and moved over to the build site. We then followed this up by having the class split into two groups, one group bringing over the rest of the log, the other clearing brush.
The next thirty minutes were spent getting thorns in my epidermis, chopping down an invasive species of rose bush, pulling up roots, chewing mint leaves, and dragging brush into a discard pile. A pretty productive day if you ask me.

Friday, April 23, 2010

Preparations




4/22/10: At 8:50 am we started a blog on Blogspot.com and started posting on the site with a draft of our first day's experiences. Everyone seems really excited and the Smart Shed ball is rolling fast. We started up again with brush clearing, taking out some invasive Multiflora rose brambles. The rose bush was no match for David Raines and Zach Mirling. Even though it was early, everyone worked hard and got a lot done today.

Post by Zach

Thursday, April 22, 2010

The Early Days



4/20/10: Today is our first day of starting to work on the beginnings of what will become to be a great tool shed! The first thing we did was calculate the radius of the circle that we will be building inside of; 6 feet. Then, averaging our estimates together, we found what we thought then would be the center of our building. Then, we marked the spot by hammering a stake into the earth. Then, we tied a piece of string onto the stake, measuring out six feet. Just as we finished this, Mike St. Pierre showed up and we discussed with him how we could go about making the shed. He said that the building footprint has to be smaller than 10 by 10 feet; that we should put in 4-6 inches of gravel as a base. He said it would be a good idea to use the concrete and stone chunks that we have and dig them into the dirt so that they are ground level; that between each cornerstone there should be pressure-treated wood and a 12 inch plate where we will then build up on. He said we should use plywood and a brand called Mulehide for the roof, which will be about six feet high on the low end and up to ten feet high on the other. One of the things we need to get working on soon is getting down the trees so that we can begin to split some cord wood, which led us into showing Mike which pine trees we had in mind for cutting. Once Mike left, half of us found a way to fell the leaning tree, while the rest of us did some brush clearing.

Post By Rabea